燃气发电机组控制系统设计要点

返回 2023.01.31 来源://www.gz-yanye.com 0
燃气冷、热、电分布式能源系统的核心设备包括燃气发电机组、吸收式冷(热)水机组、余热锅炉等。燃气发电机组设备包括各种水泵、阀门、冷却塔、冷却风机、配电柜等,如何使这些设备节能、经济地运行,控制系统是关键,那么,下面一起了解下燃气发电机组控制系统设计要点!
The core equipment of gas cooling, heating and electric distributed energy system includes gas generator unit, absorption cooling (heating) water unit, waste heat boiler, etc. The gas generator unit equipment includes various water pumps, valves, cooling towers, cooling fans, distribution cabinets, etc. The control system is the key to make these equipment operate energy-efficient and economically. Now, let's understand the design points of the gas generator unit control system!
燃气发电机组在运行过程中产生两种能量:电能和热能。在实际应用中,对电能和热能的需求是不断变化的。通过排烟系统和冷却水箱将其排放到空气中。因此,在分布式能源项目中,项目的经济可行性是一个重要的方面。必须了解项目的电力需求和热需求,设计发电机组经济的运行方案。
The gas generator unit generates two kinds of energy during operation: electric energy and thermal energy. In practical applications, the demand for electric energy and heat energy is constantly changing. It is discharged into the air through the smoke exhaust system and cooling water tank. Therefore, in distributed energy projects, the economic feasibility of the project is an important aspect. It is necessary to understand the power demand and heat demand of the project, and design the economic operation scheme of the generator unit.
燃气发电机组
当市场上电能的经济性较好时,项目申请将以产生更多电能为主要目标进行设计,同时考虑很大限度地利用余热。热能过剩时排放到空气中。在项目设计中,将以电来定热;当热能在项目应用中的经济性能良好时,项目设计将满足用户所需的热能为主要需求。
When the economy of electric energy in the market is good, the project application will be designed with the main goal of generating more electric energy, and the maximum use of waste heat will be considered. The excess heat is discharged into the air. In the project design, heat will be determined by electricity; When the economic performance of thermal energy in the project application is good, the project design will meet the thermal energy required by users as the main demand.
在产生热能的同时,项目中多余的电能将通过市电并网的方式输送至城市电网。这就是火电的设计方法。此类项目申请需要与市电力部门协调,取得上网许可。在确定是用热定电还是电定热后,我们会根据需要设计合适的控制系统来控制燃气发电机组的正常运行。更多相关内容就来我们网站//www.gz-yanye.com咨询!
While generating heat energy, the surplus electric energy in the project will be transmitted to the urban power grid through the way of urban power grid connection. This is the design method of thermal power. The application for such projects needs to be coordinated with the municipal power department to obtain the online license. After determining whether to use heat to determine power or electricity to determine heat, we will design appropriate control system to control the normal operation of the gas generator unit according to the needs. Come to our website for more relevant content //www.gz-yanye.com consulting service
新闻搜索
济南济柴环能燃气发电设备有限公司
  • 服务热线

    0531-62325028
    0531-69951266

燃气发电机组控制系统设计要点

燃气冷、热、电分布式能源系统的核心设备包括燃气发电机组、吸收式冷(热)水机组、余热锅炉等。燃气发电机组设备包括各种水泵、阀门、冷却塔、冷却风机、配电柜等,如何使这些设备节能、经济地运行,控制系统是关键,那么,下面一起了解下燃气发电机组控制系统设计要点!
The core equipment of gas cooling, heating and electric distributed energy system includes gas generator unit, absorption cooling (heating) water unit, waste heat boiler, etc. The gas generator unit equipment includes various water pumps, valves, cooling towers, cooling fans, distribution cabinets, etc. The control system is the key to make these equipment operate energy-efficient and economically. Now, let's understand the design points of the gas generator unit control system!
燃气发电机组在运行过程中产生两种能量:电能和热能。在实际应用中,对电能和热能的需求是不断变化的。通过排烟系统和冷却水箱将其排放到空气中。因此,在分布式能源项目中,项目的经济可行性是一个重要的方面。必须了解项目的电力需求和热需求,设计发电机组经济的运行方案。
The gas generator unit generates two kinds of energy during operation: electric energy and thermal energy. In practical applications, the demand for electric energy and heat energy is constantly changing. It is discharged into the air through the smoke exhaust system and cooling water tank. Therefore, in distributed energy projects, the economic feasibility of the project is an important aspect. It is necessary to understand the power demand and heat demand of the project, and design the economic operation scheme of the generator unit.
燃气发电机组
当市场上电能的经济性较好时,项目申请将以产生更多电能为主要目标进行设计,同时考虑很大限度地利用余热。热能过剩时排放到空气中。在项目设计中,将以电来定热;当热能在项目应用中的经济性能良好时,项目设计将满足用户所需的热能为主要需求。
When the economy of electric energy in the market is good, the project application will be designed with the main goal of generating more electric energy, and the maximum use of waste heat will be considered. The excess heat is discharged into the air. In the project design, heat will be determined by electricity; When the economic performance of thermal energy in the project application is good, the project design will meet the thermal energy required by users as the main demand.
在产生热能的同时,项目中多余的电能将通过市电并网的方式输送至城市电网。这就是火电的设计方法。此类项目申请需要与市电力部门协调,取得上网许可。在确定是用热定电还是电定热后,我们会根据需要设计合适的控制系统来控制燃气发电机组的正常运行。更多相关内容就来我们网站//www.gz-yanye.com咨询!
While generating heat energy, the surplus electric energy in the project will be transmitted to the urban power grid through the way of urban power grid connection. This is the design method of thermal power. The application for such projects needs to be coordinated with the municipal power department to obtain the online license. After determining whether to use heat to determine power or electricity to determine heat, we will design appropriate control system to control the normal operation of the gas generator unit according to the needs. Come to our website for more relevant content //www.gz-yanye.com consulting service