发电机组在安装时需要注意的六大要点

返回 2022.08.26 来源://www.gz-yanye.com 0
本文将为大家简单的介绍关于焦化发电机组在安装时须注意的六个要点,一起来看看看吧。
This article will briefly introduce the six points that should be paid attention to when installing the coking generator set. Let's have a look.
1、安装地点需通风良好,发电机端应有足够的进风口,焦化机端应有良好的出风口。出风口面积应大于水箱面积1.5倍以上。
1. The installation site shall be well ventilated. There shall be sufficient air inlets at the generator end and good air outlets at the coking machine end. The air outlet area shall be more than 1.5 times of the water tank area.
2、安装地的周围应保持清洁,避免在附近放置能产生酸性、碱性等腐蚀性气体和蒸汽的物品。有条件的应配置灭火装置。
2. The surroundings of the installation site shall be kept clean, and articles that can generate corrosive gases and vapors such as acid and alkaline shall be avoided from being placed nearby. Fire extinguishing devices shall be provided if conditions permit.
3、在室内使用,须将排烟管道通导室外,焦化发电机管径须≥消音器的出烟管直径,所接之管路的弯头不宜超过3个,以保证排烟畅通,并应将管子向下倾斜5-10度,避免雨水注入;若排气管时垂直向上安装的,则须加装防雨罩。
3. For indoor use, the smoke exhaust pipe must be connected to the outside. The pipe diameter of the coking generator must be ≥ the diameter of the exhaust pipe of the silencer. The elbows of the connected pipes should not be more than 3 to ensure smooth smoke exhaust. The pipes should be inclined downward by 5-10 degrees to avoid rainwater injection; If the exhaust pipe is installed vertically, a rain cover must be installed.
焦化发电机组
4、基础采用混凝土时,在安装时须用水平尺测其水平度,使机组固定于水平的基础上。机组与基础之间应有专用防震垫或用底脚螺栓。
4. When the foundation is made of concrete, the levelness shall be measured with a level ruler during installation to fix the unit on the horizontal foundation. There shall be special shockproof pads or foot bolts between the unit and the foundation.
5、机组外壳须有可靠的保护接地,对需要有中性点直接接地的发电机,则须由人员进行中性接地,并配置防雷装置,严禁利用市电的接地装置进行中性点直接接地。
5. The unit shell must have reliable protective grounding. For the generator that needs to be directly grounded at neutral point, the neutral grounding shall be conducted by professional personnel and equipped with lightning protection device. It is strictly prohibited to use the grounding device of mains power for direct grounding at neutral point.
6、发电机与市电的双向开关须十分可靠,以防倒送电。双向开关的接线可靠性需经过当地供电部门的检验认可。
6. The two-way switch between the generator and the mains must be very reliable to prevent reverse power transmission. The wiring reliability of the two-way switch shall be inspected and approved by the local power supply department.
发电机组在安装时需要注意的六大要点上述已经讲解完毕了,希望能够给您好的帮助,更多事项就来我们网站//www.gz-yanye.com咨询吧!
The six main points that should be paid attention to during the installation of the generator set have been explained. I hope you can help me. For more matters, please visit our website //www.gz-yanye.com Consult!
新闻搜索
济南济柴环能燃气发电设备有限公司
  • 服务热线

    0531-62325028
    0531-69951266

发电机组在安装时需要注意的六大要点

本文将为大家简单的介绍关于焦化发电机组在安装时须注意的六个要点,一起来看看看吧。
This article will briefly introduce the six points that should be paid attention to when installing the coking generator set. Let's have a look.
1、安装地点需通风良好,发电机端应有足够的进风口,焦化机端应有良好的出风口。出风口面积应大于水箱面积1.5倍以上。
1. The installation site shall be well ventilated. There shall be sufficient air inlets at the generator end and good air outlets at the coking machine end. The air outlet area shall be more than 1.5 times of the water tank area.
2、安装地的周围应保持清洁,避免在附近放置能产生酸性、碱性等腐蚀性气体和蒸汽的物品。有条件的应配置灭火装置。
2. The surroundings of the installation site shall be kept clean, and articles that can generate corrosive gases and vapors such as acid and alkaline shall be avoided from being placed nearby. Fire extinguishing devices shall be provided if conditions permit.
3、在室内使用,须将排烟管道通导室外,焦化发电机管径须≥消音器的出烟管直径,所接之管路的弯头不宜超过3个,以保证排烟畅通,并应将管子向下倾斜5-10度,避免雨水注入;若排气管时垂直向上安装的,则须加装防雨罩。
3. For indoor use, the smoke exhaust pipe must be connected to the outside. The pipe diameter of the coking generator must be ≥ the diameter of the exhaust pipe of the silencer. The elbows of the connected pipes should not be more than 3 to ensure smooth smoke exhaust. The pipes should be inclined downward by 5-10 degrees to avoid rainwater injection; If the exhaust pipe is installed vertically, a rain cover must be installed.
焦化发电机组
4、基础采用混凝土时,在安装时须用水平尺测其水平度,使机组固定于水平的基础上。机组与基础之间应有专用防震垫或用底脚螺栓。
4. When the foundation is made of concrete, the levelness shall be measured with a level ruler during installation to fix the unit on the horizontal foundation. There shall be special shockproof pads or foot bolts between the unit and the foundation.
5、机组外壳须有可靠的保护接地,对需要有中性点直接接地的发电机,则须由人员进行中性接地,并配置防雷装置,严禁利用市电的接地装置进行中性点直接接地。
5. The unit shell must have reliable protective grounding. For the generator that needs to be directly grounded at neutral point, the neutral grounding shall be conducted by professional personnel and equipped with lightning protection device. It is strictly prohibited to use the grounding device of mains power for direct grounding at neutral point.
6、发电机与市电的双向开关须十分可靠,以防倒送电。双向开关的接线可靠性需经过当地供电部门的检验认可。
6. The two-way switch between the generator and the mains must be very reliable to prevent reverse power transmission. The wiring reliability of the two-way switch shall be inspected and approved by the local power supply department.
发电机组在安装时需要注意的六大要点上述已经讲解完毕了,希望能够给您好的帮助,更多事项就来我们网站//www.gz-yanye.com咨询吧!
The six main points that should be paid attention to during the installation of the generator set have been explained. I hope you can help me. For more matters, please visit our website //www.gz-yanye.com Consult!